Installation and Commissioning

b_800_600_0_00_images_Stock_IntroImages_controls-intro-image.png

We offer a full installation service on our products.

Standard service is transport to site, switchboard positioning, fixing down, re-suiting and site test.

Using our team of expert installers and trained and certified crane lorry drivers, we will move the switchboard sections from the transport into your switch room. The panel sections will be positioned, levelled, re-suited and fixed down. After re connection of any busbar fish-plates, the board will be retested, ready for commissioning by either ourselves, the customer, or both.