Click here to read how a Tecnivel/Charnvel 3 panel changeover board saved the day. Orignally installed in 2003 at Lewisham, the changeover board was later decomissioned yet proved its worth as an emergency replacement due to the catastrophic failure of an Allen West LVAC board.
Over the past few years Charnvel Ltd have supplied many more changeover panels of this design to various areas of the rail system.
Charnvel Ltd. (or as Tecnivel (UK) Ltd) have supplied a number of 400 volt shore supply panels to the following locations.
Read more ...Charnvel Ltd. have supplied a variety of equipment for use on both the London Underground and Docklands Light Railway.
The Ashford and Ramsgate depots have been designed to house and maintain the new Hitachi ‘Javelin´ fleet.
Ashford site is being developed to provide stabling, CET and maintenance facilities for the fleet and also to house the existing ‘Classic´ domestic rail services.
Charnvel Ltd. provided 750 DC contactor panels for these projects.
Charnvel Ltd. (or as Tecnivel (UK) Ltd) have supplied a number of 850 / 1000 volt shore supply panels to the following locations.
Read more ...Charnvel Ltd have completed the installation and commissioning of a 3 road shore supply panel at Worcester Shrub Hill Station.
Our Shore Supply Units supply the rolling stock with the necessary power to enable the units to be shut down overnight yet maintain comfort heating and cooling, lighting and engine heating.
Read more ...
Charnvel Ltd (or as Tecnivel (UK) Ltd) have in the past supplied SSPs at the following sites.
Read more ...