Charnvel Ltd (or as Tecnivel (UK) Ltd) have in the past supplied SSPs at the following sites.

Type

Year

Location

Relocatable Electrical Building. 650V SSP 2006 Bankhall
Relocatable Electrical Building. 650V SSP 2000 Fawkham Junction
650V 240KVA Signal Supply Point complete with 650V 240KVA generator and auto sync controls 2000 Leeds 1st
Relocatable Electrical Building. 650V SSP 1998 Dover SSP
Relocatable Electrical Building. 650V SSP and bypass panel 1998 Port Glasgow
Relocatable Electrical Building. 650V SSP 1997 Barnes SSP
2 No.s Relocatable Electrical Building. 415V and 650V SSP 1997 Glazebrook & Throstles Nest
Relocatable Electrical Building. 650V SSP, bypass panel (Signalling and transmissions) 1996 Holywell
Relocatable Electrical Building. 650V SSP. (1 No.s 650V Changeover and Bypass switchboard, 1 No.s 650V S&T switchboard) 1995 Shotton
3 No.s Relocatable Electrical Building. 650V SSP 1994 Kirkby Summit & Oldham Mumps
8 No.s Relocatable Electrical Building. 650V SSP 1992 Various sites (MerseyRail)