One of our largest System 50 switchboards was supplied to ABB as part of the Pen y Cymoedd Wind Energy Project. The switchboard was installed on a floor standing support frame as the incoming and outgoing cable access was from below.
Charnvel additionaly supplied the switchboard for the connection from the wind farm, to the new National Grid substation at Rhigos.
All aspects of the LVAC supply were covered by Charnvel; design, manufacture, testing, installation and comissioning.
Read more ...As part of the new build, Blackhillock substation, Keith, Scotland, Charnvel Ltd were contracted to supply 3 off System 50 type switchboards, each with a raised floor support frame.
As the availabilty of supply was a primary concern for our customer, the three switchboards were delivered, positioned and re-suited during December 2015. Temporary supplies could then be installed to the boards.
Our 2500A system 50 switchboard installation at National Nuclear Laboratory facility in Workington.
4000A 'L' shaped distribution switchboard with 2 No.s power factor correction sections.
Installed in the switchroom
An suite of 3 of our System 50 type switchboards have been installed in Primarks' new Manchester store.
The panels were designed with tight size constraints in mind, shipped and installed in sections, and re-suited by out Installation Team.
2500A System 50 switchboard awating factory witness test.
58° North, and our most distant UK mainland delivery.
A System 50 switchboard supplied to Scottish Power, delivered, installed and comissioned adjacent to the Dounraey nuclear site.
Read more ...
Our System 50 design triumped again where a switchboard with bus-duct section was required.