Switchboards for Scottish Power

Scottish Power Logo

Iberdrola Logo

As part of the LVAC framework agreement between Charnvel Ltd and Scottish Power / Iberdrola, we have supplied to the following sites.

Switchboards are of our System 50 design and in compliance with STS-03-1203 & NGTS 3.12.3.

 

Site Date Notes
Tir Gwynt May 2016 800A Distribution switchboard and DGCP
Ewe Hill Wind Farm Connection February 2016 800A Distribution switchbaord and Diesel Generator Connection Panel
Galawhistle Wind Farm Connection January 2016 400A From4 type 5 Distribution switchboard
Wishaw 400/275kV Substation July 2015 400A TPN Distribution Switchboard
Blacklaw extension 132/33kV Substation June 2015 400A Distribution board Form 4 Type 7
Sighthill 275kV Substation October 2014 400A Distribution board Form 4 Type 7
Bonnybridge June 2014 400A Form 4 type 7 System 50 distribution switchboard
BOLD Grid 132kV Substation March 2014 400A Form 4 type 7 System 50 distribution switchboard
Oswestry 132kV Substation February 2014  2 no's 400A Form 4 type 7 System 50 distribution switchboards
Kirkby GIS Project January 2014 400A Form 4 type 7 System 50 distribution switchboard
400A L.V Distribution board for Ellesmere Port November 2013 400A Switchboard
Bainsford September 2013 400A Form 4 type 7 System 50 distribution switchboard
Moffat 400/132kV substation February 2013 800A TPN L.V. distribution switchboard
Bonnybridge 132kV Substation May 2012 800A TPN L.V. distribution switchboard
Arecleoch 132/33kV Substation December 2009 800A TPN L.V. distribution switchboard
Amlwch Grid Substation November 2009 400A TPN Distribution Switchboard
Maentworg 275kV Substation July 2009 400A TPN Distribution Switchboard
Crystal Rig Windfarm May 2009 800A TPN L.V. distribution switchboard